New: role-based approval matrix and session-replay activity tracking are live. Read more

Category

Inventory & Costing

Stock accuracy, valuation and knowing the true cost of a piece.

Running a factory means keeping track of every nut, bolt, and sheet of steel that comes in and goes out. The stock ledger isn’t just a spreadsheet—it’s the heartbeat of your costing. One wrong count or misplaced receipt can throw off your entire job costing, make cycle counts a nightmare, and leave you guessing what you’re really making on each order. Most shops fight the same battles: parts disappearing into the wrong bin, invoices arriving after the material was already used, or production pulling from stock without anyone updating the system. These small errors add up to big headaches when you try to price a new job or figure out why your margins are shrinking. This section covers the real issues that break stock accuracy and how to fix them before they cost you money.

Newsletter

One article a week, no sales mail

Practical notes on costing, stock accuracy, planning and quality — written for people who run plants.

Questions about inventory & costing

What people ask before they start

How do I stop parts from going missing between receiving and the shop floor?

Start by scanning every receipt into the system at the dock and immediately assigning it to a location. Train operators to pull from the system instead of grabbing parts from random bins. If something moves, update the ledger right away—don’t wait until the end of the shift.

Why does my stock valuation keep changing even when I haven’t bought or sold anything?

Hidden adjustments like scrap write-offs, mislabeled returns, or unposted adjustments are usually the culprit. Run a quick variance report between physical counts and the system to spot where the gaps are happening.

What’s the fastest way to find out the true cost of a part I’m about to make?

Pull the material, labor, and overhead costs directly from the latest job cards and receipts tied to that part number. If your system tracks scrap and rework separately, include those too—otherwise your cost will be off before you even start.

How often should I do cycle counts to keep my stock ledger clean?

Cycle count high-value or fast-moving items weekly, and the rest monthly. Focus on parts that appear on multiple open jobs first—those are the ones causing the most confusion when they’re short or overstocked.

What’s the easiest way to spot phantom inventory that’s inflating my stock value?

Look for items with zero usage over the last 6 months but still showing high quantities. Check the receiving log to see if those receipts were ever posted correctly. Often, the problem is a misplaced receipt that never made it into the ledger.

How do I make sure my production team isn’t using the wrong material on a job?

Label every bin with the correct part number and barcode, and require operators to scan the bin before pulling material. If they try to pull from the wrong location, the system should block it unless they enter a supervisor override.

Every question we get asked

Next step

See it running on a real plant, with your questions in the room

The demo carries four months of live documents — orders, batches, inspections, payroll and books that tie. Ask for access and we will walk your process through it.

Request demo access What the demo covers

One business day to reply. No card. No installation.
Or message us on WhatsApp +44 7348 614469 · [email protected]