Manufacturing ERP · built on a live factory
Run the whole factory from one screen
Sales orders, purchase, stores, production, quality, costing, finance, payroll and approvals in a single system — proven on a live factory, and shown to you on a guided demo.
See how to judge itForty seconds: the two questions every factory asks, and the screen that answers them.
Why plants replace their system
Most factories do not lack software. They lack one version of the truth.
Stores keep a notebook, production keeps a register, sales keeps a spreadsheet and accounts reconstructs the month afterwards. Every number is defensible on its own and none of them agree.
Stock that does not exist
Issues recorded days later, batches split by hand, and a store balance nobody trusts enough to plan against.
Costing after the fact
Cost per piece calculated at month end from memory, so pricing decisions are made blind.
Approvals on paper
A junior raises a purchase order and it sits on a desk, or worse, gets released with nobody accountable.
Reports that arrive late
Owners see last month when they need to act on this week.
How it works
One chain of documents, from enquiry to trial balance
One order for Alcarra, followed through the plant. Every step below is a screen in the system, and each one posts the entry the next step reads.
-
Step 01
The price goes out
Alcarra are quoted £4.10 a piece for a 550 GSM bath towel. The quotation is a document in the system, so the price can be held against what the order later costs.
-
Step 02
Sales confirms an order
Forty-two thousand pieces, due 28 October. Quantity, price and promised date are agreed once here, and every later step reads them from this row rather than from a note about it.
-
Step 03
Purchase covers the material
Twelve thousand kilos of 30s combed yarn are ordered against it — and the order sits awaiting approval, where everyone can see it, rather than on somebody's desk.
-
Step 04
The floor runs the order
A production order is raised against SO-1188 and routed through the plant. Eighteen thousand six hundred of the forty-two thousand are woven so far, entered where the work happens.
-
Step 05
The dyehouse works to a recipe
Six hundred and forty kilos go into a soft flow against the navy recipe, and come out off shade. The batch is marked for re-processing rather than quietly passed on.
-
Step 06
Quality is recorded where it happens
Inspection sits at the stage, not at the end. The rejected batch is captured against its own number, so the re-dye becomes a cost on this order instead of a rumour about the dyehouse.
-
Step 07
Costing answers the pricing question
Material, chemicals and conversion against the pieces actually made: £4.47 each, against the £4.10 quoted. The order is still open, which is the only time that number is worth anything.
-
Step 08
The books close themselves
Those same 18,600 woven pieces are the £36,270 sitting in the grey store. Every posting came from an operational document, so the trial balance is a report rather than a monthly reconstruction.
The product
Twelve modules. One system of record.
Sales & Order Book
Quotation to invoice with a live order book, delivery tracking and customer ledgers.
Purchase & Suppliers
Requisition to payment, with GRN, incoming QC, supplier bills and payables in one chain.
Inventory & Stores
One stock ledger for every store, batch and rack — no negative stock, no parallel spreadsheets.
Production & Planning
Route every order through the plant — weaving, dyeing, finishing, stitching, packing — with real output per shift and machine.
Quality Control
Incoming, in-process and final inspections with defect capture and a 4-point score.
Product Costing
Cost per piece and per kilo built from actual material, wages, utilities and overheads.
Finance & Accounts
Double-entry accounting that posts itself from operations — trial balance, P&L and balance sheet always tie.
HR & Payroll
Attendance, shifts, leave, advances and payroll for monthly, daily-wage and piece-rate staff.
Dynamic Approvals
Decide which documents need approval, at how many levels, by which role and above which amount.
Business Control Centre
One screen for the whole business — money, orders, plant, quality, people and pending approvals.
Activity Tracking & Session Replay
Know who logged in, from where, on what device, what they did and how long they spent on each screen.
Roles, Users & Audit
Department-level roles with per-module view, create, edit and delete rights — enforced in the API, not just the menu.
Reports & Exports
Twenty-five plant and finance reports, filterable and exportable, with no report-writer licence to buy.
For the owner
The screen you put on the wall
Built for a 62-inch display in the office: what came in, what went out, what is pending with whom and since when, and whether this month is actually profitable.
- Sales, purchases, profit, receivable, payable, cash and stock value, month to date and year to date
- Document counts for today and this month across every module, drafts included
- Production output, waste percentage, conversion cost per kilo and QC pass rate
- Pending approvals with the role holding them and how long they have waited
- Role-scoped, so a plant manager and a financial controller see different screens
Control without paperwork
Approvals your seniors configure themselves
Turn approval on for a module, set how many levels it needs, map each level to roles and amount slabs. The document posts itself when the last approval lands.
- Per-module switch — no code change to add or remove a control
- Amount slabs, so a small order does not need three signatures
- Reject and send-back with a written reason on the record
- A creator can never approve their own document
- Ageing on the pending queue, so nothing sits quietly for a week
Industries
Built for factories, customised for the rest
The engine — documents, stock ledger, double-entry books, approvals, roles — does not care what you make. The modules above it are shaped to your process.
Textile & Towel Manufacturing
Yarn to packed carton: looms, dyehouse, finishing, stitching and packing with batch-level costing.
Apparel & Garments
Style-wise bills of material, cutting and stitching lines, trims control and buyer-wise costing.
Food & Beverage
Recipe control, batch traceability, shelf-life and wastage with full lot recall.
Pharmaceutical & Nutraceutical
Controlled documents, approval chains, batch records and audit trails for regulated plants.
Auto Parts & Engineering
Job orders, machine loading, sub-contracting and maintenance against schedule.
Chemicals & Coatings
Formulation control, hazardous stock handling, batch strength and effluent-linked costs.
Judge it yourself
A live demo with four months of real operating data
Deployed and running on a European towel manufacturing plant — the same build is what we open for evaluations.
The demo is not published openly — we give access to businesses evaluating the system, so what you see is a controlled sandbox rather than a public playground.
| What is loaded | Volume |
|---|---|
| Sales orders, deliveries and invoices | 25 orders · 16 dispatches · 16 invoices |
| Purchase chain | 15 orders · 13 receipts · 13 supplier bills |
| Production entries | 22 production orders · 94 weaving · 105 dye batches |
| Quality inspections | 150 inspections with defect rows |
| People | 43 employees · 3,870 attendance days · 3 payroll runs |
| Books | 107 vouchers · trial balance in balance · no negative stock |
Pricing
Per plant, not per seat you cannot afford to give out
Starter
For a plant putting its first system in place: sales, purchase, stores and finance running properly.
Growth
The full factory: production routing, quality, costing, payroll and a dynamic approval matrix.
Enterprise
Multi-plant, multi-company and multi-currency with your own workflows, integrations and language.
Custom build
Not a manufacturer? The same engine is customised for any business, any process, any language — priced per scope.
From the blog
Field notes on running a factory on ERP
Cut Fabric Costs by Optimizing ERP Production Scheduling
Fabric production costs hide in unbalanced machines, idle shifts and excess inventory. ERP scheduling optimization cuts...
How ERP Yield Analysis Cuts Fabric Costs Without Sacrificing Quality
Fabric yield analysis in ERP uncovers hidden waste in production—scrap, rework, and idle time—that costs more than raw m...
How to Integrate OEE Data with ERP Without Heavy IT Work
Integrating OEE data with your ERP doesn’t require IT teams. This guide explains how to select a system that works with...
Look before you talk to us
Three ways to judge it without a sales call
Nothing here is gated. Read, click through the real screens, and put your own numbers in.
Screen-by-screen tour
Twelve real screens in the order the work happens: order to production to quality to costing to books.
Payback calculator
Admin hours, wastage, working capital and write-offs — arithmetic with every assumption printed.
The towel mill it grew from
Ten looms, 43 people, four months of documents and a trial balance that ties. The dataset the demo carries.
How to judge it
Three steps, about twenty minutes
No sales call needed to form an opinion. Read, then open the demo, then talk to us only if it fits.
Read what the system actually does
Twelve module pages, each listing the documents it ships with and the reports it produces — plus the industry page closest to your business.
Ask for the demo and try to break it
We send a login to a sandbox holding four months of documents, and walk it with you: follow one order from enquiry to invoice, then check that the trial balance ties. Nothing you do there touches a real plant.
Then talk to us about your plant
WhatsApp either office, email us, or send the form. We ask how the work flows today, tell you what we would configure and what we would build, and quote it. If it is not a fit, we say so.
Questions
Asked before every deployment
Is this a real product or a demo build?
It is a working ERP that runs a European towel manufacturing plant today. The public demo is the same build, loaded with four months of documents — sales orders, production, quality, payroll, vouchers — so you are judging the real thing, not a slide deck.
Can it be customised for a business that is not a factory?
Yes. The engine underneath — documents, stock ledger, double-entry accounting, approvals, roles, reporting — is industry agnostic. We reshape the modules, forms, documents and reports around your process. Tell us how you work and we will show you the shape it would take.
Which languages are supported?
Any language you need, including right-to-left scripts. The interface is fully translatable and we deliver the language files with your deployment. Documents and reports can print in a different language from the interface if your buyers need that.
Do we have to move all departments at once?
No. Most plants start with stores, purchase and sales, then bring production, quality and payroll in once the floor is comfortable. Approvals are switched on module by module when you are ready.
How long does implementation take?
Implementation is staged by department. The first department typically goes live in four to six weeks, with the rest following every two to three weeks. The timeline depends on how quickly you can provide masters and opening balances, and how much time your team can devote to training.
Do you support our country’s e-invoicing portal?
We build integrations for e-invoicing portals on request, provided the portal offers a REST API or file-based submission. You will need to give us the API credentials, a test environment, and a sample invoice payload. The integration is quoted separately and built after the core ERP is live.